Skip to content

Case studies

Three composites. No borrowed glory.

The studies on this page are composites. They combine situations the studio is built to handle. They are not a named client’s results, they are not audited, and they are not a promise that your path will rhyme with theirs.

How to read the figures

Any percentage or week-count below is an illustration of the decision a range was meant to support. It is not a measured return, not a testimonial, and not evidence that a model “beat the market”.

Factory planning illustration used for the components composite

Composite · Components

The call-off that moved, and the payroll that did not

A components group, turnover in the high teens of millions, supplying two assembly plants. The workbook forecast treated the order book as if every line would call off in the week it was pencilled. Payroll, a Friday constant, was the thing that was actually reliable.

The standing pack split timing into a distribution. In the stress sketch, two call-offs slipped a month and the cash index touched a level that would have made a covenant conversation urgent if it had been left until the week itself. The useful change was procedural: treasury opened that conversation against the stress page, on a calendar, instead of against a surprise.

What we claim: a clearer meeting. What we do not claim: that the slips were avoided, or that any saving can be attributed to the model as if it were a profit centre.

Composite · Regional grocery

The promotion that stole from the following week

A regional grocery group judged deals on the week of the deal. The till tape, read as a sequence, kept showing a quieter week afterwards. The chain average also hid three shops whose like-for-like had been fading under the cheer of two strong sites.

The pack started reporting the deal and the hangover as one event, and like-for-like by cohort beside new space. The illustrated planning change was dull and useful: labour hours for the week after a deep promotion were no longer copied from the promotion week. Waste on short-life lines was discussed as a range, not as a scolding after the fact.

No figure on this page is a published trading statement. The pattern — deal, hangover, cohort — is the part worth copying into a brief if it sounds like your Monday.

Quarterly path document plate used for the grocery composite
Desk plate with a sample pack, used for the partnership composite

Composite · Design partnership

Work-in-progress is not cash

A design partnership of several dozen people recognised revenue with hope and billed with delay. The pipeline slide and the cash slide disagreed, and both were presented as if they were the same object.

The forecast separated accepted invoices, aged work-in-progress, and proposals. Utilisation was a driver with a ceiling. In the illustrated upside, the constraint was review time at partner level, not a shortage of enquiries. The decision the range was built to inform was whether to hire a producer or to stop taking a class of work that locked partners into unbilled review.

Again: a composite of a planning problem. If you need a case study with a logo and a percentage for a pitch deck, we are the wrong studio. We will not invent one.

Bring your own calendar.

A useful first meeting starts from your last ugly month, not from these sketches.

Request a brief